Poseidon Nickel

Operations

Projects

Poseidon's key operations at the Windarra Nickel Project

Mt Windarra

The Mt Windarra Project is now ready for development after extensive engineering, drilling and refurbishment completed in 2013. View Mt Windarra

Black Swan

Black Swan is an integrated nickel sulphide open pit and process plant which Poseidon expects to reopen. View Black Swan

South Windarra

South Windarra is an open pit located 14kms from Mt Windarra. The pit will supply mine process water to the Mt Windarra concentrator and act as a tailings dump. Poseidon believes that an eastern extension to the ore body exists. View South Windarra

Cerberus

The Cerberus greenfield mine was discovered by Poseidon in 2008 and is now ready for development after extensive engineering, drilling and refurbishment completed in 2013. View Cerberus

Gold Reprocessing

Poseidon intends to reprocess up to 5m tonnes of gold tailings located at Mt Windarra and left over from previous operations in the 1980’s. View Gold Reprocessing